6. Tighten NUTS by hand.
While tightening the FIXING SCREW WITH CABLE SLIT hold
the cables upwards, so that these are not jammed!
7. Loosen the grub screw from the INSIDE LEVER
HANDLEslightly to remove any potential mechanical
stress from the SQUARE spindle.
8. Check whether the handle set is correctly aligned.
9. Tighten the NUTS with the wrench (max. 1.2 Nm).
Halten Sie während des Festziehens der
BEFESTIGUNGSSCHRAUBE MIT LEITUNGSSCHIENE die
Leitungen nach oben, damit diese nicht
eingeklemmt werden!
Page 56 of 141 Long shield ILS
4.7 Assembling wide shield (for rosette-holes)
Overview: Master media usage
Help & troubleshooting Technical data
Maintenance & disposal
Operation Administration
Assembly
Basics