Verifying Switch Operation
Before you install the switch in a rack or on a table or shelf, power on the switch and verify that it passes
POST.
To power on the switch, plug one end of the AC power cord into the switch AC power connector, and plug
the other end into an AC power outlet.
As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the switch
functions properly. LEDs can blink during the test. POST lasts approximately 1 minute. The SYST LED
blinks green, and the other LEDs remain solid green.
When the switch completes POST successfully, the SYST LED remains green. The LEDs turn off and then
reflect the switch operating status. If a switch fails POST, the SYST LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.
After a successful POST, unplug the power cord from the switch and install the switch in a rack, on a table,
or on a shelf.
Cisco Catalyst 9200 Series Switches Hardware Installation Guide
30
Preparing for Installation
Verifying Switch Operation

Table of Contents

Other manuals for Cisco Catalyst C9200L-24PXG-4X-E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco Catalyst C9200L-24PXG-4X-E and is the answer not in the manual?

Cisco Catalyst C9200L-24PXG-4X-E Specifications

General IconGeneral
BrandCisco
ModelCatalyst C9200L-24PXG-4X-E
CategorySwitch
LanguageEnglish

Related product manuals