EasyManuals Logo

Cisco GoQAM User Manual

Cisco GoQAM
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #33 background imageLoading...
Page #33 background image
Installation Process Summary
4004834 Rev D 17
Stage Process See Procedure
8 Define the MPEG sources and
provision the GoQAM using DNCS
Element Provisioning according to
your network wiring diagram.
Provision the RF GoQAM (on
page 37)
Provision the IF GoQAM (on page
53)
Digital Network Control System
Online Help
9 Power on the GoQAM N/A
10 Ensure that the GoQAM boots
correctly and check for alarms from the
front panel.
Understand the Boot Process (on
page 78)
Troubleshooting Alarm Messages
(on page 134)
Troubleshooting Boot Screen Error
Messages (on page 143)
11 Connect the RF or IF output ports.
Connect the RF OUT or IF OUT Ports
(on page 33)
12 Set the power output level in
accordance with your network wiring
diagram and spectrum analyzer
measurements.
Adjust the RF Output Level of a
Selected Carrier (on page 87)
Adjust the IF Output Level of a
Selected Carrier (on page 110)
13 If sessions have been defined for the
GoQAM path, verify the correct
session count by pressing the
OPTIONS button.
RF: Viewing the Session Count (on
page 91)
IF: Viewing the Session Count (on
page 114)
14 If encrypted, check the program count.
RF: Viewing the Program Count
(on page 91)
IF: Viewing the Program Count (on
page 114)
15 Verify video and audio from a local
DHCT.
See the post-upgrade procedures for
your current System Release contained
in the upgrade installation
instructions.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Cisco GoQAM and is the answer not in the manual?

Cisco GoQAM Specifications

General IconGeneral
BrandCisco
ModelGoQAM
CategoryModulator
LanguageEnglish