F-1
Cisco Nexus 7000 Series Hardware Installation and Reference Guide
OL-23069-07
APPENDIX
F
Site Preparation and Maintenance Records
This appendix provides a site planning list to use when preparing your site for the Cisco Nexus 7000
Series switch and includes these sections:
• Site Preparation Checklist, page F-1
• Contact and Site Information, page F-2
• Chassis and Module Information, page F-3
Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch
operation, ventilation, and accessibility.
Table F-1 lists the site planning tasks that we recommend that you complete before you install the Cisco
Nexus 7000 Series switch. Your completion of each task ensures a successful switch installation.
Table F-1 Site Planning Checklist
Planning Activity Verification Time and Date
Space evaluation:
•
Space and layout
• Floor covering
• Impact and vibration
• Lighting
• Physical access
• Maintenance access
Environmental evaluation:
•
Ambient temperature
• Humidity
• Altitude
• Atmospheric contamination
• Airflow