9 Removal and Replacement Procedures 9-1
Introduction 9-1
Safety 9-2
Preventing Electrostatic Discharge Damage 9-3
Supported Hardware 9-3
Removing and Replacing the Power Supply 9-4
Required Tools 9-4
Removing an AC-Input Power Supply 9-4
Installing an AC-Input Power Supply 9-6
Removing a DC-Input Power Supply 9-6
Installing a DC-Input Power Supply 9-8
Removing and Replacing the Fan Assembly 9-13
Required Tools 9-13
Removing the Fan Assembly 9-13
Installing the Fan Assembly 9-14
Removing and Replacing Modules 9-15
Required Tools 9-15
Handling SIPs 9-15
Installing a Module 9-16
Removing a Module 9-20
Inserting and Removing a Module: Detail 9-22
Verifying the Installation 9-23
Installing and Replacing the Cisco SCE 8000-SCM Module 9-26
Installation and Upgrade Procedures for Dual Cisco SCE 8000-SCM Modules 9-26
First-Time Installation 9-26
Installing a Cisco SCE 8000-SCM Module that was a Slave Module as a Master Module 9-27
Removing a Cisco SCE 8000-SCM Module 9-27
Adding a Cisco SCE 8000-SCM Module in Slot 2 9-27
Downgrading Dual Cisco SCE 8000-SCM Modules 9-28
Upgrading Dual Cisco SCE 8000-SCM Modules 9-28
Removing and Replacing Shared Port Adapters 9-29
Required Tools and Equipment 9-29
Laser/LED Safety 9-29
Handling SPAs 9-30
SPA Installation and Removal 9-31
Installing a SPA in a SIP 9-32
Removing a SPA from a SIP 9-32
Removing and Replacing the Optical Bypass Module 9-33