202
ENGINE
CHECKING AND SETTING THE VALVE TIMING
Engines : RHY - RHZ N° RPO 9128 #
Slacken the screw (17) of the tensioner roller (18).
Remove the timing belt (14).
Checks.
IMPERATIVE : Just before refitting, carry out the checks below :
Check that :
The rollers (18) and (15) turn freely (without play and without any tight spot).
The coolant pump pulley (16) turns freely (without play and without any tight spot).
There are no traces of oil leaks from the crankshaft and camshaft seals, etc.
The crankshaft pinion travels freely on the keyway.
Replace defective components if necessary.
Peg the crankshaft pinion (19) by inserting tool [9] on the LH side of the keyway.
B1EP1A8D B1EP1A9C
XSARA - XSARA PICASSO