MAN.243 Rev.5 ENG - Use and maintenance manual S28 page 135 of 138
8.9 Five-yearly maintenance 103
8.10 Safety rules during maintenance 103
8.11 Maintenance of endothermic engine 104
8.12 Maintenance of electric engine 105
8.13 Maintenance of tracks 106
8.14 Consumables 107
8.15 Indications for the demolition of the
MEWP 108
8.16 Service 109
9Troubleshooting 111
10Sealings list 113
11Stability and overload tests 114
12Operating tests 115
13Control register 116
13.1 Delivery of the MEWP to the first owner
116
13.2 Further transfers of ownership 117
13.3 Replacement of mechanisms 119
13.4 Replacement of structural elements 121
13.5 Replacement of hydraulic components
123
13.6 Replacement of electrical components
125
13.7 Replacement of safety devices 127
13.8 Considerable failures and relevant
repairs 129
13.9 Periodical inspections and maintenance
register 131
13.10 Notes 133