Servicing requirements
Note: The following preventive maintenance charts cover all Hydrovane compressors using Hydrovane Fluid Force oils. The work to be
carried out must be done on or before the hours shown for this action.
Read health and safety precautions before starting any work.
Service schedule: Fluid Force Clear Oil (1000 Hour oil change)
The bulk oil temperature must not exceed 90°c. If the oil is working above this temperature, the oil life will be reduced.
Note: When changing to Fluid Force Clear the compressor must be flushed out with Fluid Force Prime in order to comply with USDA H1
standard.
Page 4
CompAir Hydrovane
Introduction
Preventative Maintenance Schedule Fluid Force Clear
Maintenance Actions and Manual
Reference
Install
Every
Day
Every
Week
Every
1000
hrs
Every
2000
hrs
Every
6000
hrs
Every
12000
hrs
Every
24000
hrs
Suitable sited
3 33333
Adequate ventilation
3 33333
Ambient temperature
33333333
Sufficient access
3
Clear of airborne contaminants
33333333
Torque electrical connections
3 3333
Check oil level at filler plug 1C
3 33333
Check correct drive rotation
33
Check for air leaks
3 33333
Check for oil leaks
3 33333
Check air filter 1C
3
Check power on load
3 33333
Check power off load
3 33333
Check oil temperature 1B
33333333
Check RSU oil temperature
33333333
Check servo pressure on load
3 33333
Check servo pressure off load
3 33333
Check motor cable glands secure
3 3333
Check motor for damage 1C
3 33333
Check motor for loose connections 1C
3 33333
Check motor cables and earth 1C
3 33333
Check motor for vibration
3 33333
Check perishable oil pipes
3
Check oil seal 1C
333
Check drive media
333
Check operation of non-return valve
3 33333

Table of Contents

Related product manuals