Installa tion l 3-3
Unpacking the Boxes (continued)
6 Take a moment to record serial numbers and electrical power specifications
in the blanks provided on the back of the User Guide’s title page. The
information will be helpful if you ever need service or parts.
7 You are now ready to begin installation.
Follow the preparation steps on the next page, then choose one of the two
mounting options:
Dryer on the floor, single hopper (with HTC Hopper Temperature Control
package) on a floor stand.
Dryer on the floor, multiple hoppers in central configuration (ResinWorks)
with separate heat source for each hopper.
3
Installa tion
NOTE: The W600 - 5000 provides no heat to the process air. A separate heat source is
required at the hopper(s) inlet to heat the air to the desired drying temperature.
Preparing for Installation
The Carousel Plus W Series Dryer is easy to install if you plan the location and
prepare the mounting area properly.
1 Make sure the mounting area provides:
A grounded power source supplying the voltage and correct current
for your dryer model. Check the dryer’s serial tag (on the control box) for
the correct amps, voltage, phase, and cycles. Field wiring should be com-
pleted by a qualified personnel to the planned location for the dryer. All
electrical wiring should comply with your regions electrical codes.
A source of water, when using the aftercooler/intercooler and/or pre-
cooler. The W Dryers aftercooler/intercooler and precooler require
tower, city, or chiller water at temperatures of 45° to 8F {7° to 29°C}.
Refer to the Specifications Sheet (page 2-7) for flow rate for your unit.
Piping should be ran to the planned dryer location. Use flexible hose to
connect the water pipes to the aftercooler/intercooler and/or optional pre-
cooler.
Minimum clearance for safe operation and maintenance. You should
maintain 24 in. {61 cm} clearance on all sides of the dryer.
Material and conveying lines
installed. If you plan to use
vacuum or compressed air
loaders to fill the hopper,
install conveying lines to the
drying hopper location.
NOTE: The aftercooler/inter-
cooler reduces the temperature
of air returning from the drying
hopper, improving the efficien-
cy of the desiccant.