3-20 l Install ation
Testing the Installation (continued)
4 Press the STOP button.
If everything is installed correctly:
• The blowers will continue running as needed to cool the heaters.
(until regeneration heaters are less than 150°F {66°C})
5 The test is over. If the dryer performed the normal operating sequences as
outlined, you can load the hopper and begin operation. If it did not, refer to
the Troubleshooting section of the User Guide.
Stop