EasyManua.ls Logo

corob D600 - Standard Material Supplied; Installation; Storage

corob D600
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SHIPPING AND HANDLING
- 25 -
COROB™ D600 - D700 - D800TX
4.2.2 Standard material supplied
After unpacking the machine, make sure the following items are present:
1. Power supply cable.
2. Computer power cables.
3. USB cable.
4. Equipment software tools standard CD.
5. Panel key.
6. User’s manual and product documentation.
7. Spare parts.
With puncher only:
8. T-wrench.
9. Tool for punch removal.
10. Manual plugger.
Depending on the options specied on the purchase order, you may also nd:
Management software.
Any accessories to be installed on the machine.
Make sure that all of the above items are included in the packing; if not, contact the manufacturer.
4.3 Installation
Once the machine has been unpacked and placed in its operating site, it must be installed.
WARNING
Only qualied and appropriately trained personnel are authorized to install the machine.
4.4 Storage
If stored, the machine must be kept in a safe and protected environment, with a suitable temperature and
humidity degree and protected from dust.
1
2
5
WARRANTY
6
7
9
10
8
3
4

Table of Contents

Related product manuals