EasyManua.ls Logo

Cosmo CX 1500 - Handling: Loading and Unloading

Cosmo CX 1500
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TWIN DISC CENTRIFUGAL FERTILIZER SPREADER - FERTI 1500/2150/2400/2800/3200
TWIN DISC CENTRIFUGAL FERTILIZER SPREADER - CX 1500/2150/2400/2800/3200
5-3
Cod. MNenA055CER05 Rev. 05/05.2018 © Agrex S.p.A.
DANGER!
Dangerofcrushingand/orcollisionduetotheliftedmachinefalling!
Neverstayunderneaththemachinewhenitislifted.
5.
HANDLINGANDINSTALLATION
This sectiondescribesthe correct proceduresforhandlingand installing the machine,operations thatmay cause seriousor very serious
injuries,forexampleduetocollisionandcrushingbyoverturnedloadsorusingunsuitablehoistingequipment.
5.1.
HANDLING:LOADINGANDUNLOADING
Alsosee:
§“1.3.MACHINERATINGPLATE”onpage14
§“4.4.TECHNICALSPECIFICATIONS”on page 47
OPERATION IMAGE
To
liftthemachine
, only usehoistingequipment that is suitable
fortheweightbeinglifted.
Onlyusethepointsofattachmentprovidedtocouplethehoisting
equipment.
Carefullyunloadthemachinefromthetruck:the personresponsible
mustcoordinatealltheunloadingoperationsuntilthemachineis
completely resting on a suitable, even surface with a sufficient
capacitytosupportthedistributionoftheloads,asshownonthe
ratingplateandthesupportpoints.
To
handle the machine
,use a pallet trolley orforkliftthat is
suitablefortheweightbeinglifted.
Liftthemachinewhenstillsecuredtothepallet.
If the machine is not installed immediately,but rather needs to be store d temporarily,it must be placed in a dry and sheltered place.
Toprotectthevariouspartsagainsttheelements,leavethemachineinitsoriginalpackaging.
05‐HANDLINGANDINSTALLATION

Table of Contents