2. Terminate Pos PV Strings at fuseholders. The RSD wirebox only
contains fuseholders for the positive DC conductors. Follow instructions in
step 3 for the negative conductors. Strip approximately ½ inch of the cable
jacket from the end of the string conductor. Insert the conductor into the
fuseholder terminal ensuring the stranding of the conductor remains firmly
twisted and does not separate. Tighten the screw clamp to the torque
specified in Table 3-6. Continue terminating the remaining strings in this
manner for each MPPT (PVIn1, PVIn2, PVIn3).
3. Terminate Neg PV Strings at busbar (RSD wirebox). The RSD wirebox
only contains fuseholders for the positive DC conductors. Follow
instructions in step 2 for the positive conductors. The negative DC
conductors are to be terminated on the busbar. Strip approximately ½ inch
of the cable jacket from the end of the string conductor. Insert the conductor
into the busbar ensuring the stranding of the conductor remains firmly
twisted and does not separate. Tighten the screw to the torque specified in
Table 3-7. Continue terminating the remaining negative DC conductors in
this manner for each MPPT (PVIn1, PVIn2, PVIn3).