Crane 787E

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Crane 787E and is the answer not in the manual?

Crane 787E Specifications

General IconGeneral
BrandCrane
Model787E
CategoryMerchandiser
LanguageEnglish

Summary

Electrical Power Requirements

Voltage Check

Procedure to verify the correct voltage at the wall receptacle using a voltmeter.

Polarity Check

Procedure to confirm proper electrical polarity of the wall receptacle.

Machine Controls and Indicators

Machine Controls and Indicators (continued)

How to Turn the Merchandiser ON and OFF

Initial Machine Setup

Move the Merchandiser Through a Narrow Doorway

Steps to facilitate moving the machine through tight spaces by removing panels.

Move the Merchandiser Through a Narrow Doorway (continued)

Snack Module Setup

Tray Setup for Vending

Tray Vertical Adjustment

Loading Trays with Product

Loading Trays with Product (continued)

Tray Loading Procedures

Tray Return to Vending Position

Price Label Installation

Price Label Installation (continued)

Price Roll Adjustment

Process for setting individual product prices using the price rolls.

Selection ID Label Installation

Selection ID Label Installation (continued)

Selection ID Label Placement Guide

Information on matching ID labels to tray and motor positions.

Gum and Mint Unit Setup

Price Label Installation for Gum/Mint

Attaching price labels next to column ID numbers on the gum/mint unit.

Loading Gum/Mint Dispenser

Final Machine Installation

Merchandiser Leveling Procedure

Procedure for ensuring the machine is stable and level.

Refrigeration Module Setup

External Drain Connection (Optional)

Instructions for connecting the refrigeration module to an external drain.

Air Vent Adjustment for Chillers

How to optimize airflow and temperature for chilled units.

Coin Mechanism Setup

Setting the Quarter Switch

Configuration of the coin mechanism's high quarter switch.

Machine Programming

Setting Product Prices

Procedure for assigning prices to product selections.

Final Machine Checkout

Testing Product Vending Selections

Performing test sales to ensure proper product dispensing.

Operational Readiness Checks

Spiral Indexing (Single Spiral/Motor)

Spiral Indexing (Dual Spiral/Motor)

Bill Validator Testing