Procedure
1. Use a pallet jack to position the crate so that there is adequate space to roll the rack down the ramp.
2. Unlock the draw latches that secure the rear panel to the crate.
Video:
Refer to the Uncrate a 19in APC Rack service video: 00:001:14.
3. Unlock the draw latches that secure the front panel ramp to the crate, remove the front panel and position the
ramp securely on the crate guide pins.
IMPORTANT:
4. Position one trained person in front of the rack to guide it an slow its decent.
5. Position the other trained person behind the rack to push.
CAUTION:
● Personal Injury or Damage to Equipment
● The rack weighs 1720 lbs (780kg) in its shipping configuration. Momentum can carry it down the
ramp quickly. Be sure the cabinet casters stay centered over the ramp rails when the cabinet rolls
down the ramp. Failure to do so could result in personal injury or equipment damage.
6. Carefully roll the rack off the ramp slowly in a straightforward direction.
7. When the rack is clear of the ramp, stop its movement.
Uncrate the ClusterStor L300 and L300N Rack
16