Engine Removal
6-1
6. Engine Removal
Service Information 6-1
Engine Removal 6-2
Service Information
General Safety
NOTE
● The following works can be carried out without removing the engine from the vehicle body.
- Transmission (⇨ Section 11)
- A.C. generator (⇨ Section 8)
- Kick starter, continuously variable transmission(⇨ Section 7)
- Cylinder head, cylinder, and piston (⇨ Section 9 and 10)
- Carburetor (⇨ Section 5)
- Oil pump (⇨ Section 2)
●Items to be worked after removing engine
- Crankshaft, crankshaft bearing, crank case bearing
● Engine oil capacity: 1.0ℓ-when disassembled
Torque values:
Engine hanger bolt (Front): 2.7kg-m(27N.m, 20ft-1b)
(Rear) : 3.5kg-m(35N.m, 25ft-1b)
Use a jack to remove or install the engine. Support the motorcycle with a jack firmly, taking precautions
not to damage the frame, engine, cable or harness.
Attach tape to the frame to protect it during the engine removal or installation.
6