Pilot's Operating Handbook
Section 4
Normal procedures
EASA Approved
Edition 0 - March 05, 2019
Rev. 0
Page 4.5.13
Utilization by cold weather (- 0°C to - 25°C) and very cold
weather (- 25°C to - 40°C) - Envelope 1 1/3
● NOTE ●
The procedure hereafter supplements the normal procedures for the airplane
use when operating in the Envelope 1 defined in figure 4.5.1.
●
Preflight inspection :
1 - Remove any snow or ice from the wings, stabilizers and movable
surfaces.
According to the condition of runways and taxiways
2 - Perform procedure Utilization on runways covered with. . . . . . . . . . . .
melting or not tamped snow
Refer to chapter 4.5
or
3 - Perform
procedure Utilization on icy or covered with. . . . . . . . . . . . . . .
tamped snow runways
Refer to chapter 4.5
4 - Carry out a complete rotation of the propeller to check its free rotation.
5 - Do not perform a fuel draining. If the airplane is operating permanently
under negative temperatures, drainings will have to be performed once a
week after having parked the airplane in a heated hangar.
6 - Remove chocks and / or release ties from the airplane.
7 - Check the free deflection of the flight controls and of the elevator trim.
8 - Check the free deflection of THROTTLE.
Before starting engine / Engine start / After engine start :
9 - Perform normal procedures defined in chapter(s) 4.3 and / or 4.4.
Before taxiing / Taxiing / Before line up / Takeoff :
DE ICE SYSTEM panel
10 - DE ICE SYSTEM mode switch MAN. . . . . . . . . . . . . . . . . . . . . . .
All deicing systems turn on
11 - INERT SEP switch Check ON. . . . . . .
. . . . . . . . . . . . . . . . . . . . .
Continue ►