Daikin AZQS100B8V1B - Vacuum Drying; To Perform Vacuum Drying; Charging Refrigerant; About Charging Refrigerant

Daikin AZQS100B8V1B
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6Installation
Installerreferenceguide
15
AZQS100~140B8V1B+AZQS100~140B7Y1B
Splitsystemairconditioners
4P3855291–2014.08
6.5.5 Toperformvacuumdrying
1 Vacuumthesystemuntilthepressureonthemanifoldindicates
−0.1MPa(−1bar).
2 Leaveasisfor45minutesandcheckthepressure:
Ifthepressure… Then…
Doesnotchange Thereisnomoistureinthe
system.Thisprocedureis
finished.
Increases Thereismoistureinthe
system.Gotothenextstep.
3 Evacuateforat least2hours toapressure onthemanifold of
−0.1MPa(−1bar).
4 After turning OFF the pump, check the pressure for at least
1hour.
5 IfyoudoNOTreachthetargetvacuumorcannotmaintainthe
vacuumfor1hour,dothefollowing:
Checkforleaksagain.
Performvacuumdryingagain.
NOTICE
Make sure to open the stop valves after installing the
refrigerantpipingand performing vacuumdrying.Running
the system with the stop valves closed may break the
compressor.
6.6 Chargingrefrigerant
6.6.1 Aboutchargingrefrigerant
The outdoor unit is factory charged with refrigerant, but in some
casesthefollowingmightbenecessary:
What When
Chargingadditionalrefrigerant Whenthetotalliquidpiping
lengthismorethanspecified
(seelater).
Completelyrechargingrefrigerant Example:
Whenrelocatingthesystem.
Afteraleak.
Chargingadditionalrefrigerant
Beforechargingadditional refrigerant, makesurethe outdoor unit's
externalrefrigerantpipingischecked(leaktest,vacuumdrying).
INFORMATION
Dependingontheunitsand/ortheinstallationconditions,it
mightbenecessarytoconnectelectricalwiringbeforeyou
canchargerefrigerant.
Typical workflow – Charging additional refrigerant typically consists
ofthefollowingstages:
1 Determiningifandhowmuchyouhavetochargeadditionally.
2 Ifnecessary,chargingadditionalrefrigerant.
3 Fillinginthefluorinatedgreenhousegaseslabel,andfixingitto
theinsideoftheoutdoorunit.
Completelyrechargingrefrigerant
Beforecompletelyrechargingrefrigerant,makesurethefollowingis
done:
1 Thesystemispumpeddown.
2 Theoutdoorunit'sexternalrefrigerantpipingischecked(leak
test,vacuumdrying).
3 Vacuumdryingontheoutdoorunit'sinternalrefrigerantpipingis
performed.
NOTICE
Before completely recharging, perform vacuum drying on
theoutdoorunit'sinternalrefrigerantpipingaswell.Todo
so, use the internal service port of the outdoor unit
(between the heat exchanger and the 4way valve). Do
NOT use the service ports of the stop valves, because
vacuum drying cannot be performed properly from these
ports.
WARNING
Some sections of the refrigerant circuit may be isolated
from other sections caused by components with specific
functions (e.g. valves). The refrigerant circuit therefore
features additional service ports for vacuuming, pressure
relieforpressurizingthecircuit.
Incaseitisrequiredtoperformbrazingontheunit,ensure
thatthereisnopressureremaininginsidetheunit.Internal
pressuresneedto be releasedwithALL the serviceports
indicated on the figures below opened. The location is
dependingonmodeltype.