EasyManua.ls Logo

Daikin VRV Inverter K Series - Page 134

Daikin VRV Inverter K Series
412 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Flowcharts SiE-05C
120 Troubleshooting Inverter K Series
Preset temperature
Intake air temperature
a = b = 1 (a = b = 0.5 possible for FXYC, FXYE, FXYF, FXYH, FXYK only.)
Cooling operation
Auxiliary electric heater (52H): OFF
Auxiliary electric heater (52H): OFF
Program dry display: Cancelled Normal operation
Set direction of air flow
Swing flap?
Recycling guard timer
ON (5 minutes)
Program dry on/off? Program dry in operation
Moisture prevention
condions?
Moisture prevention position
Cassette: P1
Suspended :P0
YES
YESNO
OFF
NO
Yes
ON
YES
YES
4
5
6
(Option)
(Option)
NO
Fan M1F operating at set
volume of air flow
Drain-up kit M1P : OFF after 5
minutes residual operation
Frost
prevention operation
in progress?
Test run in progress?
Thermostat status?
(Option)
Drain-up kit Y1E : ON
OFF
(Option)
Drain-up kit M1P : OFF after 5
minutes residual operation
Electronic expansion valve
Y1E : OFF
Thermostat on operation signal to
outdoor unit: Cancelled
Electronic expansion valve Y1E:
Capacity control
Thermostat ON operation signal
to outdoor unit: Output
Drain-up kit M1P : ON
A
(VF022)
NO
NO
4 If the evaporator inlet temperature is -5˚C or lower for a total of 10 minutes, or is -1˚C or lower for a
total of 40 minutes, frost prevention operation is initiated. Normal operation resumes when the
temperature is +7˚C or higher for 10 consecutive minutes.
5 Thermostat status
6 The drain-up kit is standard equipment for models FXYC - H, FXYF, FXYK and FXYS.
SI-05C.BOOK Page 120 Monday, November 6, 2000 4:13 PM
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Related product manuals