EasyManua.ls Logo

Daikin VRV Inverter K Series - Drain Pump Control

Daikin VRV Inverter K Series
412 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SiE-05C Functions
Functions Inverter K Series 45
1.16 Drain Pump Control
1. The drain pump is controlled by the ON/OFF buttons (4 button (1) - (4) given in the figure below).
1.16.1 When the Float Switch is Tripped While the Cooling Thermostat is ON:
1. The objective of residual operation is to completely drain any moisture adhering to the fin of the indoor
unit heat exchanger when the thermostat goes off during cooling operation.
2. One cycle consists of 5 minutes of operation, 5 seconds stop, and another 5 minutes of operation.
1.16.2 When the Float Switch is Tripped During Cooling OFF by Thermostat:
SI-05C.BOOK Page 45 Monday, November 6, 2000 4:13 PM
Все каталоги и инструкции здесь: http://splitoff.ru/tehn-doc.html

Table of Contents

Related product manuals