EasyManua.ls Logo

Dell EMC Unity Series - Page 12

Dell EMC Unity Series
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 3 Best Practice: Using the portable lift adjacent to the long side of the DAE
Assembling and configuring the portable lift
Procedure
1. Using the instructions provided with the lift kit, assemble the portable lift.
2. Configure the lift depending on the height to which the instrument must be
lifted.
Option
Description
For installations at or
below 49 inches (28U)
above floor level:
You must use the lower (single) mast
configuration.
Refer to: Using the lift on an enclosure less than
49" above the floor
For installations > 49
inches (28U) above floor
level:
Use the "Voyager" conversion kit and a support
table kit with the lower (single) mast configuration.
See: Using the lift on an enclosure more than 49"
above the floor
Refer ro: Adjusting the portable lift
Field Upgrade Procedure
12 Unity All Flash and Unity Hybrid Field Upgrade Procedure

Other manuals for Dell EMC Unity Series

Related product manuals