%3*45&&.7BQPSMPHJD*OTUBMMBUJPOBOE0QFSBUJPO.BOVBMt1BHF
t $PNNVOJDBUJPODPOOFDUJPOT
– Vapor-logic4 keypad
– Ethernet
– Modbus
– BACnet
– LonTalk
– Multiple-tank communication
t 1SPHSBNNBCMFUSJBDBOESFMBZ
t "SFBUZQF4%6EJTQFSTJPOGBOTPSTUFBNCMPXFST
t $PNCVTUJPOBJSTXJUDIBOEQPXFSWFOU(54TZTUFNTPOMZ
2. Complete the Setup process.
See instructions beginning on Page 28.
3. Start up humidifier(s).
See instructions on Page 37.
Refer to the Pre-installation Checklist and drawings on the
previous pages, and then make the field wiring connections as
described on the following pages.
*OTUBMMBUJPOQSPDFTT
Installation