–
Remove plastic plugs from the drill-holes 6.
–
Push Allen wrench 3 mm through the drill-hole 6 and loosen
clamping screws at the lever 5.
–
Align needle bar linkage as to the needle hole.
–
Tighten screws at the lever 5.
–
Tighten screw 3.
–
Tighten screws 1 and 2.
–
Screw in sewing foot pressure screw 4 and adjust sewing foot
pressure (see chapter 2.7.3).
ATTENTION: Danger of breakage !
Check the distance between hook tip and needle after the lateral
alignment of the needle bar linkage. If needed, correct hook tip
distance (see chapter 2.5).
17
GB
5
6