Eaton 9355 UPS (10/15 kVA) User’s Guide 164201594—Rev H0 57
Figure 42. Lowering the Leveling Feet
2. Attach the stabilizing bracket to the bottom of the cabinet rear panel using the retained hardware from the
shipping pallet according to the cabinet configuration:
For one cabinet, see Figure 43.
For two cabinets, see Figure 44.
For three cabinets, see Figure 45.
NOTE No more than three cabinets can be attached together. For four cabinets, use two of the
two-cabinet installations. For five cabinets, use one three-cabinet and one two-cabinet
installation.
3. Use the holes and slots in the bottom of the bracket to attach the cabinet to the flooring if desired.
4. Continue to one of the following sections:
See paragraph 4.5 Internal Battery Tray Wiring Connections to connect the internal battery tray wiring.
See paragraph 4.6 Extended Battery Module Installation to install optional EBMs.
See Chapter 6 Communication to install UPS communication options, such as X-Slot cards or remote
emergency power-off (REPO).
See Chapter 7 UPS Operating Instructions to start up the UPS.
NOTE After UPS startup, ensure maximum battery runtime by configuring the UPS for the
correct number of EBMs (see 7.6 Configuring the UPS for EBMs).