104 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Figure 57. Supervisory Contact Module II Terminal Location.
Ground
Terminal
Terminal TB1 Signal
Connections from the UPS
Terminal TB3
120 Vac Power
Terminal TB2 Customer
Supervisory Contact Interface
NOTE Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an
authorized Eaton Customer Service Engineer. Contact an Eaton service representative
to schedule a date.
9. Install wiring between the SCM II terminal block TB2 and the monitoring equipment. See Figure 57 for
terminal block location and Figure 58 for terminal assignments.
10. Close the front door and secure the latch.
11. Restart the UPS. See Chapter 7 UPS Operating Instructions for startup instructions.
Installing Options and Accessories