Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14 43
protection. With dual auxiliary MOBs, one UPM can be bypassed while the remaining UPMs support the
load as long as the remaining UPMs have the capacity to do so.
33..33 IInnssppeeccttiinngg aanndd UUnnppaacckkiinngg tthhee UUPPSS CCaabbiinneett
The UPS cabinet is palleted separately for shipping. The cabinet is shipped bolted to a wooden pallet (see
Figure 14 through Figure 15) and protected with outer protective packaging material.
The UPS cabinet is heavy (see Table 2). If unpacking and unloading instructions are not closely followed, the
cabinet may tip and cause serious injury.
To prevent damage to the wiring channel and wiring in the UPS cabinet base when lifting or moving the
cabinet:
Lift and move the cabinet using only the front or rear forklift slots.
Verify that the forklift forks are in a horizontal position before inserting them into the forklift slots. DO NOT
angle fork tips upward.
Insert the forks all the way through the base. DO NOT insert forks partially into the base to move the
cabinet.
Forks may be partially inserted into the front or rear forklift slots for minor positioning if the forks are kept
in a horizontal position with no upward angling.
DO NOT use the forklift slots on the end of the cabinet to move the cabinet.
End forklift slots may be used for minor positioning if the forks are kept in a horizontal position with no
upward angling.
If these instructions are not followed, damage to the wiring channel and wiring will occur.
1. Carefully inspect the outer packaging for evidence of damage during transit.
Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative
immediately.
NOTE For the following step, verify that the forklift or pallet jack is rated to handle the weight
of the cabinet (see Table 2 for cabinet weight).
2. Use a forklift or pallet jack to move the packaged cabinet to the installation site, or as close as possible,
before unpacking. If possible, move the cabinet using the pallet. Insert the forklift or pallet jack forks from
the right side of the pallet (facing the cabinet), between the supports on the bottom of the pallet (see
Figure 11 and Figure 12 for the UPS cabinet center of gravity measurements). If the cabinet must be
moved using the cabinet front or rear fork lift slots, see the caution statement at the beginning of this
procedure.
UPS Installation Plan and Unpacking

Table of Contents

Other manuals for Eaton Power Xpert 9395P

Related product manuals