EATON BladeUPS
®
(12 kVA) User's Guide S 164201649 Rev 4www.eaton.com/powerquality
17
Chapter 3 Installation
This chapter explains:
S Equipment inspection
S Required tools
S Unpacking the cabinet
S Parallel system setup
S Extended Battery Module (EBM) setup and installation (optional)
S UPS setup and installation, including UPS internal batteries
S Parallel installation (optional)
S Initial startup
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping cartons and
packing materials for the carrier or place of purchase, and file a claim for shipping
damage. If you discover damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier
within 15 days of receipt of the equipment; 2) Send a copy of the damage claim
within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has expired and the
batteries were never recharged, do not use the UPS. Contact your service representative.
Tools Required
To assemble the components, you may need the following tools:
S Medium flat-bladed screwdriver
S Short-handled #2 Phillips
®
screwdriver
S Long-handled #2 Phillips screwdriver
S 7 and 8 mm wrench or socket

Table of Contents

Other manuals for Eaton Powerware Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton Powerware Series and is the answer not in the manual?

Eaton Powerware Series Specifications

General IconGeneral
BrandEaton
ModelPowerware Series
CategoryUPS
LanguageEnglish

Related product manuals