INSTALLATION
EATON BladeUPS
®
(12 kVA) User's Guide S 164201649 Rev 4www.eaton.com/powerquality
31
Rack Setup for the UPS
C A U T I O N
The UPS is heavy (see page 99). Removing the UPS from its carton requires a minimum of two people. Use
the corrugated lifting sling (packaged with the UPS) to move the UPS.
NOTE Mounting rails are required for each individual cabinet.
To install the UPS rail kit:
1. Select the proper holes in the rack for positioning the UPS in the rack (see
Figure 17).
NOTE The UPS takes up position 1 through position 12.
NOTE Verify that the hole patterns on the rails and mounting brackets align with the hole pattern on the
rack.
Position 1
Position 9
Mounting
Bracket
Top of RailPosition 12
Position 4
Bottom of Rack
or Top of Other
Cabinet
Bottom of Rail
Figure 17. Front Rail Screw Positions for the UPS