OPERATION
EATON BladeUPS
®
(12 kVA) User's Guide S 164201649 Rev 4www.eaton.com/powerquality
74
Setting Power Strategy
To set the power strategy:
1. Press any button to activate the menu options, then select SETTINGS, USER
SETTINGS, and POWER STRATEGY.
2. Select HIGH EFFICIENCY or STANDARD, and OK to confirm.
Configuring Battery Settings
Set the UPS for the number of EBMs installed, whether to:
S Set the level for the Battery Low alarm
S Run automatic battery tests
Configuring the UPS for EBMs
To ensure maximum battery runtime, configure the UPS for the correct number of
EBMs:
1. Press any button on the front panel display to activate the menu options, then
select SETTINGS, USER SETTINGS, BATTERY SETUP, and NUMBER OF EBMS.
2. Use the
or buttons to select the number of EBMs according to your UPS
configuration:
All UPS and EBM Cabinets
Number of EBMs
UPS only 0 (default)
UPS + 1 EBM 1
UPS + 2 EBMs 2
UPS + 3 EBMs 3
UPS + 4 EBMs 4
3. Press the button to save the setting.
4. Press the
ESC
button until the Start screen appears.