EasyManua.ls Logo

Eaton SM65 - Page 31

Eaton SM65
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup and Configuration
Copyright © 2004-2009 Eaton Corporation. All Rights Reserved.
IPN 997-00012-35E December 2009
25
Step 1 – Connect the CBC to the SM65
Connect the CBC(s) to the rack communications port (XS11) of the SM65
supervisory module (see diagram on page
2 for location) as shown in the
following diagram.
A (9V DC, 400 mA) power supply output is available from this port.
Depending on the load demand from the rack communications bus, an
Auxiliary Power Module (APM) may be required to boost the available power
of the rack communications bus. (See application note AN0020 to determine
whether additional power on the rack communications bus is required.)
"
Network Management System or PC
with PowerManagerII/DCTools.
#
Ethernet (preferred) or RS232
$
Communications network. Protocol:
S3P/IP
%
SM65 supervisory module
!
Rectifier magazines (4 shown). For
Access Power Solutions (APS)
systems RCP IN is labeled RCP (S8)
and RCP OUT is labeled NEXT (S9).
&
CellSure Battery Controller (CBC) -
up to four.
3
SiteSure I/O master modules, if fitted.

Table of Contents

Related product manuals