EasyManua.ls Logo

ECD SmartDRY SD Series - Page 91

ECD SmartDRY SD Series
119 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SD Series Dry Cabinets Setup and Operation Manual | A62-3337-00 Rev: 1.0.0 Page 85
3) Slide the Cabinet Cover back about 2 cm (1/2”) and then tilt to up disconnect Light Tower from the
Power Board.
4) Set the Control Cover aside on a flat surface.
5) Remove the hardware screws from the bracket. Pull the Light Tower and bracket off of the Control
Cover.

Table of Contents

Related product manuals