EasyManua.ls Logo

ECD SmartDRY SD Series - Initial Setup and Power Connection

ECD SmartDRY SD Series
119 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SD Series Dry Cabinets Setup and Operation Manual | A62-3337-00 Rev: 1.0.0 Page 30
8.1 SAFETY AND INSTALLATION
Make sure you have read and follow the 4.0 Operators Safety Information and 5.0 Setup recommendations in
the previous sections.
8.2 LOCATION
Move the ECD SmartDRY™ Cabinet into the desired position. Refer to topic 5.2 Location for minimum dis-
tance.
8.3 FILIMENT REEL RACK CONFIGURATION
Install the filiment reel racks to meet your storage requirements.
8.4 POWER
Connect to properly grounded power plug.

Table of Contents

Related product manuals