EasyManua.ls Logo

ECD SmartDRY SD Series - Page 95

ECD SmartDRY SD Series
119 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SD Series Dry Cabinets Setup and Operation Manual | A62-3337-00 Rev: 1.0.0 Page 89
4) Plug the Light Tower into the Power Board.
5) Slide the Control Cover back into place and secure with the cover screws.
6) Reconnect the power plug to the power source.

Table of Contents

Related product manuals