–  19  –
3 Switch Chassis
This chapter includes these sections:
◆ “Rack Mount Guidelines” on page 19
◆ “How to Install the Switch in a Rack” on page 20
◆ “Switch Cooling Requirements” on page 22
◆ “How to Replace a Fan Tray” on page 24
◆ “Optional Expansion Modules” on page 25
◆ “How to Install or Replace an Expansion Module” on page 25
Rack Mount Guidelines
When rack mounting the switch, pay particular attention to the following factors:
◆
Rack Types:
 You can use any standard EIA 19-inch equipment rack with either 
two or four posts. The bracket hole pattern should be spaced 1U (1.75 in. or 
4.45 cm) apart.
◆
Rack Stability:
 Whenever possible, secure the rack to the building ceiling or 
floor, particularly if you are located in a region where earthquakes are common. 
◆
Rack Planning: 
When installing equipment in a rack, first plan how units can 
be best arranged. Try to always mount the heaviest equipment at the bottom 
of the rack.
◆
Temperature:
 Since the temperature within a rack assembly may be higher 
than the ambient room temperature, check that the rack-environment 
temperature is within the specified operating temperature range. See “Switch 
Cooling Requirements” on page 22.
◆
Mechanical Loading:
 Do not place any equipment on top of a rack-mounted 
unit.
◆
Circuit Overloading: 
Be sure that the supply circuit to the rack assembly is 
not overloaded.
◆
Grounding:
 Rack-mounted equipment should be properly grounded.