EasyManua.ls Logo

Edge-Core ES4626F - User Manual

Edge-Core ES4626F
792 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Powered by Accton
Management Guide
ES4626F/ES4650F
24/48-Port
Stackable Layer 3
Gigabit Ethernet Switch

Table of Contents

Questions and Answers

  • R
    Rebecca JohnsonAug 1, 2025
    How to access the on-board configuration program via a serial port connection on Edge-Core Switch?
    • M
      Martin DavisAug 1, 2025
      To access the on-board configuration program via a serial port connection on your Edge-Core switch, ensure your terminal emulator program is set to VT100 compatible with 8 data bits, 1 stop bit, no parity, and the baud rate is set to 9600, 19200, 38400, 57600, or 115200 bps. Verify that the null-modem serial cable conforms to the pin-out connections provided in the Installation Guide.
  • E
    Elizabeth WestAug 21, 2025
    What to do if I cannot connect to Edge-Core ES4626F Switch using Secure Shell?
    • M
      Michael HuntAug 21, 2025
      If you're unable to connect to the Edge-Core Switch using SSH, it could be due to exceeding the maximum number of concurrent Telnet/SSH sessions; try again later. Ensure the SSH server's control parameters are correctly configured on the switch and that the SSH client software is properly configured on your management station. Confirm that you've generated a public key on the switch and exported it to the SSH client. Verify that you've set up an account on the switch for each SSH user, including username, authentication level, and password. Also, ensure you've imported the client's public key to the switch if using public key authentication.
  • S
    Stephanie JohnsonNov 10, 2025
    What to do if I cannot connect to Edge-Core ES4626F Switch using Telnet, web browser, or SNMP software?
    • K
      Kim ThomasNov 10, 2025
      If you're having trouble connecting to your Edge-Core Switch via Telnet, a web browser, or SNMP software, ensure the switch is powered on. Verify the network cabling between your management station and the switch. Make sure you have a valid network connection to the switch and the port you're using is enabled. Confirm that the VLAN interface through which the management station is connected is configured with a valid IP address, subnet mask, and default gateway. Also, check that the management station's IP address is in the same subnet as the switch's IP interface. If connecting via a tagged VLAN group IP address, your management station and any intermediate switches must be configured with the appropriate tag. If you're using Telnet, you might have exceeded the maximum number of concurren...

Edge-Core ES4626F Specifications

General IconGeneral
ModelES4626F
Ports26
Gigabit Ports24
Power SupplyAC 100-240V, 50-60Hz
Switching Capacity128 Gbps
Forwarding Rate95.2 Mpps
MAC Address Table Size16K
Redundant Power SuppliesOptional
Storage Humidity5% to 95% (non-condensing)
LayerL3
Dimensions440 x 44 x mm
ManagementCLI, Web, SNMP
Jumbo Frame Support9K
Dimensions (W x D x H)440 x 44 mm
Operating Temperature0°C
Storage Temperature-40°C to 70°C
Operating Humidity10% to 90% (non-condensing)

Related product manuals