The pre-heat time required varies according to
the type of pre-heating system.
WITH INDICATION LAMP:
The indication lamp will go off in 20 seconds.
WITH CONTROL RESISTANCE:
The control resistance coil will heat red in 25
to 30 seconds.
2. Turn the starter switch key clockwise to
START position as soon as the indication lamp
goes off or the control resistance coil red
heats..
TRANSPORT
CAUTION
With dual steering — Turning both steering
wheels at the same time will damage the steer-
ing mechanism. Use only one steering wheel at
a time to steer the Eagle.
1. Release parking brake.
2. Side broom(s) and main broom must be
stopped. Brooms and conveyor must be raised
before transport. If necessary, stop side broom
rotation (right - #6, left - #2), main broom rota-
tion (#25) and conveyor rotation (#26).
Stopping rotation will raise the brooms. Raise
the conveyor using Conveyor Up / Down (#24).