EasyManua.ls Logo

Elgin Eagle E Series - Maintenance; Scheduled and Daily Maintenance

Elgin Eagle E Series
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SCHEDULED MAINTENANCE
Wash down machine after every
sweeping shift. See Daily Washdown
procedure later in this chapter.
DAILY SERVICE CHECKLIST
The numbers below correspond with the locations on
Figures M-1, and M-2.
Service after every shift or 10 hours
1 Check Engine Oil Level - Oil Dipstick
2 Check Hydraulic Oil Level - Sight Tube
3 Check Radiator Coolant Level
4 Check Tire Inflation Pressure
5 Inspect Pre-Cleaner - Air Filter (Accessory)
6 Drain Water Separator - Engine
8 Wash Down Entire Machine - Flush Out
Lower Conveyor Roller
9 Check Windshield Washer Fluid Level
10 Grease Lower Conveyor Roller Bearings (2)
11 Grease Upper Conveyor Roller Bearings (2)
12 Grease Dirt Shoe Pivot (2)
13 Check Side Broom Contact Pattern
Check Main Broom Contact Pattern
14 Inspect Water Filter
15 Service Truck Chassis
M-1
MAINTENANCE
MAINTENANCE

Related product manuals