SS2100 Analyzer
2–6 4900002253 rev. C 9-30-20
potential hazards within this document. The user is responsible for identifying
and mitigating any potential hazards present when servicing the analyzer.
Personnel Responsibility
Mitigating risks
Refer to the instructions for each situation listed below to mitigate associated
risks.
Exposuretotoxicgas(H
2
S)
Follow the procedure below if there has been any suspected leak from the
sample system and accumulated SCS enclosure.
1. Purge the SCS enclosure to remove any potentially toxic gas.
2. Tes t t he H
2
S levels of the SCS enclosure using the port from the
safety purge kit to ensure the purge has cleared any toxic gas.
3. If no gas leak is detected, open the SCS enclosure door.
Electrocutionhazard
1. Shut off power at the main disconnect external to the analyzer.
2. Open enclosure door.
If service must be performed with power engaged:
1. Note any live electrical components and avoid all contact with them.
2. Only use tools with a safety rating for protection against accidental
contact with voltage up to 1000V (IEC 900, ASTF-F1505-04, VDE
0682/201).
The safety of the analyzer is the responsibility of the installer and
the organization he/she represents.
Follow all safety protocols governing toxic gases and potential
leaks.
Complete this action before performing any service that requires
working near the main input power or disconnecting any wiring or
other electrical components.