EasyManua.ls Logo

Enterasys 08G20G2-08P - Page 58

Enterasys 08G20G2-08P
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing and Connecting a Redundant Power System
2-30 Installation
Figure 2-24 Attaching the Rackmount Brackets
2. With the mounting brackets attached, position the 08A-RPS-500 between the vertical frame
members of the 19-inch rack as shown in Figure 2-25. Then fasten the 08A-RPS-500 securely to
the frame using four customer-supplied rack screws.
Figure 2-25 Fastening the 08A-RPS-500 to the Rack
1 Rackmount brackets (2) 2 M3 x 6 mm flathead screws (8)
1 08A-RPS-500 2 Rails of 19-inch rack 3 Mounting screws

Table of Contents

Related product manuals