EasyManua.ls Logo

Enterasys SecureStack A2 A2H254-16 - Considerations Prior to Installation; Unpacking the Switch

Enterasys SecureStack A2 A2H254-16
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingthesw itch,notethefollowing:
•Beforestartingtheinstallationprocedure,notifythenetworkadministratorofthe
installation.
•Followtheins tallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchasfollows:
Table 3-1 Contents of Switch Carton
Item Quantity
A2H254-16 Switch
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting)
Rubber feet with adhesive backing for installation on a flat surface
AC power cord (The type of power cord is country dependent.)
This installation guide
Customer Release Notes
URL notice card
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. Ve rifytha tthecontentsofthecartoncontainstheitemslistedinTable31.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforanysignsofphysicaldamage.Contact
EnterasysNetworksifthereareanysignsofdamage.RefertoGettingHelpon
page16fordetails.
1
1
4
1
1
1
1

Table of Contents

Related product manuals