EasyManuals Logo

Epson G3 Series User Manual

Epson G3 Series
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #152 background imageLoading...
Page #152 background image
Maintenance 8. Arm #4
140 G3 Rev.14
(12)
Apply the
proper tension to the Z belt, and
then secure the Joint #3 motor unit.
P
ass a suitable cord or string around the Joint
#
3 motor unit near its mounting plate.
Then, pull the cord using
a force gauge or
similar tool to apply the
specified tension
shown in th
e figure on the right.
3-M4×12 + washer
Z belt tension = 74 N (7.5 ± 0.5 kgf)
Force gauge
Joint #3
motor unit
(13)
Re
-bundle the cables in their original positions with a wire tie removed in step (7).
(14)
Connect the following connectors.
Connector X231, X241, X31, X32, and X41
(15)
Connect the backup
connectors of Joint #3 and #4 (X63, X64) to the battery board.
Bundle the cables with wire tie to prevent the backup cable connectors from falling
off by mistake.
(16)
Mount the battery board to Arm #2.
2-M4×5
Battery board
2-M4×12
(17)
Mount the user plate and ground wire to Arm #2.
(18)
Install the arm
top cover and the arm bottom cover.
For details, refer to Maintenance: 3. Covers.
(19)
Perform the calibration of Joint #3.
For details on the calibration method, refer to Maintenance: 14. Calibration.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Epson G3 Series and is the answer not in the manual?

Epson G3 Series Specifications

General IconGeneral
BrandEpson
ModelG3 Series
CategoryRobotics
LanguageEnglish

Related product manuals