EasyManua.ls Logo

Epson LQ-570e - Loading envelopes

Epson LQ-570e
129 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EPSON
LQ-570e/LQ-580 Revision
C
Disassembly
and
Assembly Disassembly
and
Assembly
8
4
4.2.9
Printer
Mechanism
Disassembly
4.2.9.1
CR
Motor
Removal
1. Release
the
tension
spring.
2. Disengage
the
timing
belt
from
the
CR
motor
pinion
and
hang
it
on
the
hanger
below.
3. Remove
2
CR
mount
shaft
screws
securing
the
CR
motor
assembly
remove
the
CR
motor.
4. Remove
2
CB
(3x6)
screws
securing
the
CR
motor
to
the
motor
bracket,
and
remove
the
CR
motor.
Figure
4-15.
PF
Motor
Removal
4.2.9.2
PF
Motor
Removal
1. Remove
the
printer
mechanism.
(See
4.2.7
"Printer
Mechanism
Removal")
2. Release
the
motor
harness
from
the
printer
mechanism
securing
part.
3. Set
the
release
lever
to
the
vertical
(Rear
Push
tractor)
or
forward
(Push
tractor)
position.
4. Remove
2
CBS
(3x8)
screws
securing
the
PF
motor
to
the
right
sub
frame
and
remove
the
PF
motor.
Figure
4-16.
PF
Motor
Removal
ADJUSTM ENT
REQUIRED
After
replacing
the
CR
motor
or
timing
belt,
perform
the
Bi-d
adjustment.
Tension
Spring,
1056
Right
Sub
Frame
CR
Motor
Bracket
CR
Motor
CR
Mount
Shaft
Screw
CHECK
POINT
When
the
release
lever
is
at
the
Friction
feeding
position,
PF
motor
is
not
released.
Release
Lever
Position
PF
Motor
CBS
(3x8)
Right
Sub
Frame

Table of Contents

Other manuals for Epson LQ-570e

Related product manuals