20
Rev. 08.08.23 MANUAL FOR FLATFIX FUSION MOUNTING SYSTEM FOR FLAT ROOFS
1.
2.
6,0x25
only in combination
with grounding bracket
M6x12*
Article no.:
1000612
Article no.:
1008085
6.15 Equipotential bonding touchable metal parts (option)
If a complete equipotential bonding of touchable metal parts is desired, the wind deectors can be bonded to the proles by
applying the grounding brackets. See section 7.3.2 for the correct positions where these should be attached. The grounding
brackets can only be effectively used if the bases are equipped with grounding springs and the side deectors are bonded
with the self-tapping screw (see chapter 6.16).
NOTE! The diagram in annex section 7.3.2 shows the positions of the grounding brackets in order to connect the wind
deectors to the rest of the system.
1. Place the grounding bracket on the base prole and on the rear of the wind deectors. Attach the grounding bracket to
the base prole with a self-tapping sheet metal screw 6.0 x 25 mm SW10 HEX/T30 (article no. 1008085).
2. Place onemounting screw M6x12 in the hole of the grounding bracket and the lowest slot of the wind deector and
screw this tight into the lowest assembly hole of the high base. NOTE! The maximum tightening torque of the screw
connections is 2 Nm. Make sure that the mounting screws do not slip in the base. Refer to your tool manual to set it to the
correct torque.
*Esdec tested and approved the M6 x 12 metric screw for xing the rear wind deector to the high plastic base.