29
INSTALLATION AND START UP
Power switch
Heating lamp
Steam knob
Initial starting procedure
Before using the machine be sure to:
1. Ensure the machine’s domestic water supply is opened at the tap.
2. Turn on the main power switch and wait a few minutes for the boiler to heat up.
3. Conrm that the heating lamp is lit up while the boiler is heating. When the lamp
switches off automatically the machine has reached operating temperature.
4. Press a drink button on the keypad to bleed air out of the group boilers and to ensure
they are working (repeat for each group).
5. Open the steam knobs/taps to ensure they are working.
The machine is now ready to use.