EasyManua.ls Logo

FAAC 400 Series - 6. START-UP; 6.1 REMOVE THE BREATHER SCREW; 6.2 ADJUSTING THE FORCE (BY-PASS)

FAAC 400 Series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
400 19 732871 - Rev. D
Positive Stop
Translation of the original instructions
ENGLISH
7. PUTTING INTO SERVICE
7.1 FINAL CHECKS
1. Make sure that the forces generated by the leaf are within the
limits permitted by the current regulations. Use an impact
force tester in accordance with standard EN 12453 . For non-EU
countries, of there are no specific local regulations, the force must
be less than 150 N.
2. Check that the maximum force required to move the leaf manu-
ally is less than 225 N in residential areas and 260 N in industrial
or commercial areas.
3. Make sure that the automation is working properly with all the
devices installed.
7.2 FINAL OPERATIONS
4. Highlight all areas with adequate warning signs in which there
are still residual risks, even if all possible safety measures having
been adopted.
5. Place a “DANGER, AUTOMATICALLY CONTROLLED” sign in a promi-
nent position on the door.
6. Attach the CE marking to the gate.
7. Fill out the EC declaration of conformity and the system register.
8. Give the EC Declaration, the system register with the maintenance
plan and the instructions for use of the automation to the system
owner/operator.
8. ACCESSORIES
Refer to the specific instructions provided.
Plate to embed in masonry
Release lock with personalised
key
Fitting for RTA sheath
SAFEcoder absolute magnetic BUS
encoder

Table of Contents

Related product manuals