EasyManua.ls Logo

Festo Distributing Station - Commissioning the Distributing Station; 6.1 Workstation Setup

Festo Distributing Station
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
648811 23
The stations of the MPS are generally delivered
completely assembled
operationally adjusted as single station
commissioned
tested
Note
If stations are combined changes of the mechanical set-up and the position and
setting of sensors may be necessary.
The commissioning is normally limited to a visual check to ensure correct tubing
connections/wiring and supply of operating voltage.
All components, tubing and wiring is clearly marked so that all connections can be
easily re-established.
The following is required to commission the MPS station:
The assembled and adjusted MPS
station
A control console
A PLC board
A power supply unit 24 V DC, 4.5 A
A compressed air supply of 6 bar (600 kPa), approx. suction capacity of 50 l/min
A PC with installed PLC programming software
6. Commissioning
6.1
Workstation

Other manuals for Festo Distributing Station

Related product manuals