TWINFLEX
®
pro² Control Panel Engineering and Commissioning Manual
73
Installation Checklist
Use the following checklist to ensure that your work is correct and that the commissioning engineer has
the necessary information to complete the commissioning of the system
If you require a commissioning visit, the engineer will require this sheet, along with ‘Zone Continuity and
Insulation Test Results’ and correctly marked ‘as-wired’ drawings, before attending site to commission
the system.
Stage 1
Description
Installation
Engineer Checked
Commissioning
Engineer Checked
Zone cables installed correctly, clipped or in
containment.
All device bases and back boxes installed and
terminated.
Cable insulation and continuity testing complete, and
form filled out.
As-wired drawing marked up showing cable runs and
devices.
Control panel back-box installed with 230V AC
supply live, tested and isolated locally
Stage 2
Depending on the terms of your contract, you may also be required to carry out ‘Stage 2’.
Description
Installation
Engineer Checked
Commissioning
Engineer Checked
Devices installed into bases and back-boxes
Detector dust covers fitted
Site Name & Address:
Installation Company:
Testing Engineer:
Signature:
Date: