EasyManua.ls Logo

Flow HYPERJET 94i-S - Boost Pump Control

Flow HYPERJET 94i-S
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Boost Pump Control
When the pump is first installed or high-pressure tubing
is replaced, you must purge the system by sending pres
-
surized water through it. Touch the [I] button while the
pump is off to energize the boost pump and purge the
system.
Note: The operator must block the bleed-down to
drain so the water can flow through the high-pressure
tubing, then open the bleed-down to drain when purging
is finished so the pump can operate normally.
Turn off the purge system by touching the [O] button,
by cycling power to the system, or by starting the pump.
Navigation
Touch the Main Run Screen button to return to the
Main Run Screen
Touch the Display Services button to continue to
the Display Services screen
24 | M-390 © Flow International Corporation
HYPERJET™ 94i-S AND 94i-D PUMPS

Table of Contents

Related product manuals