Chapter 4: Maintenance
Periodic Maintenance
50 Hyperion Imaging System: User Guide
5 Using a 7/16 wrench loosen the nut holding the load coil. Use a 9/16 wrench
simultaneously to apply counterforce on the larger nut. Repeat on the opposite side.
Remove the old load coil.
6 Carefully remove the zip ties on the new load coil using a wire cutter. Remove the base
of the load coil holder but keep the load coil core in place.
7 Install the new load coil using the 7/16 wrench, to tighten the nuts and washers while
applying counterforce on the larger nuts with the 9/16 wrench.