5.2 Catibra^on signals for step S10. SI 7.
Calibration step number
Calibration voltage
S10 square wave, t kHz, 20 mV
peak-to-peak
S11 square wave, 1 kHz.
50 mV peak-to-peak
S12 square wave, 1 kHz, 100 mV
peak-to-peak
S13 square wave, 1 kHz.
200 mV peak-to-peak
S14
square wave, 1 kHz,
500
mV
peak-to-peak
S15 square wave. 1 kHz. IV
peaMo>peak
S16
square wave, 1 kHz. lOV peak-to-peak
S17 square
wave, 1 kHz, 100V peak-to-
peek
S18/19. Shift gain
*1
mode and
/8 mode
Purpose: correct for the shift
gain in "times 1 mode" and in
“dMded by 8 mode".
Calibration
equipment:
Tektronix PG 506 Square Wave Galidration
Generator
Calibration setup:
See calibration
setup H3.
Procedure:
A
-
Apply a square wave
with a frequency of 1 kHz, amplitude
200 mV peak-to-peak (between
0 mV
and
<-200
mV)
to both channels A and B. Set the
generator to the position "STD
AMPL".
B
-
Press the
READY softkey.
C
Apply a square
wave with a frequency of 1 kHz. amplitude
20 mV peak-to-
peak (between
0 mV and +20 mV) to both channels
A
and
B.
Setthe generator to the poslion
"STD AMPL".
D
-
Press the READY softkey.